- Buyer has choice from
lots 1-5 Block 23, lots 1-4 Block 24, lots 17-23 Block 22.
Upgrade to lots 5 -12 in Block 24 available.
SUBDIVISION
PLAN LINK
- Basement will be PWF
finished to perimeter walls, drywall only and rough-in plumbing
for 3 piece bathroom. Upgrade to ICF or concrete basement available.
- Construction slated for
late fall 2010 start date upon approval of financing, weather conditions
and flexibility of contractor's schedule.
- Formal contract with conditions and all
building specifications to be provided once an offer to purchase
has been made.
- Any additions/or changes
made to the original house plans/contract will be considered an
upgrade and extra charges will apply. Available upgrades
include: upgraded lot, upgraded flooring, upgraded interior/exterior
finish (ie. oak interior doors, stucco finish, etc.) cabinets, countertops
(ie. granite), finished basement, concrete driveway/sidewalks, landscaping,
fence, etc.
|